Well and aquifer testing
GEO conducted a project for a client who
operates and maintains 14 locations with relief wells in Ohio, West
Virginia, and eastern Kentucky. GEO reviewed historical data to
ascertain the hydrogeology, relief well construction, and initial or
expected well capacities of each site, before performing downhole video
analysis of 146 wells at the 14 sites. Chemical and biological sample
collection and analyses was done to document chemical and
microbiological conditions within representative wells chosen at each
site. These representative wells were then pump-tested to ascertain
initial well and aquifer capacities (generally six hour step-drawdown
tests though one site required a 48 hour constant rate test). GEO
analyzed pumping test data to determine aquifer and well parameters
including well efficiency. BCHT™ rehabilitation was performed on three
of the relief well fields, which were retested to determine their
improvement in efficiency. GEO performed all field work within a four month window from August to December, 2009 before developing a Maintenance Plan for all 14 sites (plus 3 sites from a previous study).
|
|
 |
|
|